The project involves two storage domes having a capacity of 5000 metric tons each with a bulk handling system of 220 tons per hour capacity.
The project consists more specifically of the following items:
- construction of 130' diameter concrete domes, having a 10' high concrete wall at the base;
- handling system having a capacity of 220 tons per hour of soya bean meals and/or canola meals;
- reclaiming system by front wheel unloader;
- transfer system to bulk load out station over truck for fast truck filling (250 tons per hour);
- electrical, control and automated system; and
- civil works including tunnel and receiving system from trucks and rail cars.
|
|