Sotecma was in charge of the design and job supervision of a protection system for the existing bulk shipping bins.
More specifically, the project involved the following work:
- surface preparation and painting of the structural steel;
- surface preparation and painting of the bins;
- job supervision during the work; and
- field measurement of the residual steel thickness on the bins.
|