Warehouse

Project
Warehouse

Location
Port of Montreal

Capacity
Warehouse: 55,000 MT
Filling conveyor: 1,200 MTPH

Special feature
A receiving hopper of 300MT capacity on rails.

The system is designed for ship unloading, material handling on the wharf, storage of 55,000 MT of copper ore and finally the shipping of the ore by railway cars or trucks.

The system with a capacity of 1,200 tons per hour includes among others things:

  • A mobile receiving Hopper with a capacity of 300 MT, on rails with special foundations;
  • A belt conveyor system;
  • A bulk warehouse of 55,000 MT capacity;
  • A railway cars loading system with weighing and indexing .